Analisis Tingkat Kecelakaan Kerja dengan Metode AHP Pada Perumahan Royal Bazar dan Perumahan Royal Nyalaran di Kabupaten Pamekasan

Authors

  • Syaifuddin Universitas Madura
  • Fairus Zabadi Universitas Madura

DOI:

https://doi.org/10.52072/slumptes.v3i1.852

Keywords:

Work accident rate, AHP, royal bazar housing and nyalaran.

Abstract

One of the factors that can hinder the achievement of the targets of a construction project is work accidents. According to BPJS Employment statistical data, the number of work accidents in 2019 reached 129,111 cases. Most of the work accidents or about 69.59% occurred inside the company while working, while 10.26% occurred outside the company and 20.15% were traffic accidents experienced by workers.. The object to be discussed is the level of work accidents in residential construction projects. From this object, the level of work accidents in housing construction projects will be analyzed using the Analytic Hierarchy Process (AHP) method and assisted with supporting applications, namely Expert Choice. The population used in this study are all parties involved in each housing construction project, such as contractors, planning consultants, workers, and developers of each housing construction project. Based on the data obtained, it is known that there are 3 contractors, 3 planning consultants, 43 workers and 6 developers from each housing project.

Downloads

Download data is not yet available.

References

Aprizaldi, M,F (2022). Analisis Risiko Kecelakaan Kerja dalam Penggunaan Tower Crane dengan Metode Anaytical Hierarchy Process. Inersia. Vol.18, No.1, 83-93.

Adzim, H. I. (2020). Formulir Laporan Statistik Kecelakaan Kerja.

Dwi, BW, (2022). Manajemen Kontruksi Profesional. Yogyakarta: DEE PUBLISH.

Huda, N dkk. (2021). Faktor-Faktor yang Berhubungan dengan Kecelakaan Kerja pada Pekerja Proyek Pembangunan Gedung di PT.X Tahun 2020. Jurnal Kesehatan Masyarakat, Vol.9,No.5, 652-659.

Juarni, J., dkk (2019, May). Analisa Tingkat Risiko Kecelakaan Kerja pada Bagian Foundry di PTPN IV Unit Pabrik Mesin Teneradolok Ilir. In Seminar Nasional Teknik (SEMNASTEK) UISU (Vol. 2, No. 1, pp. 183-189).

Organization IL. (2013). The Prevention Occupational Diseases. ISSA

Rahman DP, dkk. (2020). Buku Ajar Model Sistem Pendukung Keputusan dengan AHP dan IPMS. Surabaya: SCOPINDO Media Pustaka.

Sari Mila, dkk. 2020. Kesehatan Lingkungan Perumahan. Indonesia: Yayasan Kita Menulis.

Siswanto B, dkk. (2019). Manajemen Proyek. Semarang: CV. Pilar Nusantara.

Sulystianingsih E, Dkk. (2022). Analisis Penyebab Kecelakaan Kerja Dengan Menggunakan Metode Analytical Hierarchy Process (AHP) Di PT. BSPL. Jurnal Sains dan Tekhnologi.

Supriadi, A dkk. (2018). Analytical Hierarcy Process (AHP) Tekhnik Penentuan Strategi Daya Saing Kerajinan Bordir. Yogyakarta: DEE PUBLISH.

Wahyudi, A,B. (2018). Modul E learning Keselamatan dan Kesehatan Kerja (K3). Asosiasi Tenaga Teknik Indonesia (ASTTI), LPK TTI.

Downloads

Published

2024-07-15