Alternatif Manajemen Kapasitas Proyek Peningkatan Struktur Jalan Labuhan Sreseh Kabupaten Sampang
DOI:
https://doi.org/10.52072/slumptes.v3i1.848Keywords:
Capacity planning, capacity implementation, capacity monitoring, capacity management.Abstract
Capacity is a breakthrough or a number of units that a facility can storage, receive, or produce in a particular time period. Capacity often determines the need for capital and therefore large fixed costs. This research uses quantitative methods. There is an effect of capacity planning variables (x1) on capacity management (y) with gis value. 0.012 < 0.05 and t_calculated value 2.694 > 2.056. There is an influence of capacity implementation variables (x2) on capacity management (y) with sig value. 0.000 < 0.05 and t_calculated value 5.101 > 2.056. There is no influence of capacity monitoring variables (x3) on capacity management (y) with sig value. 0.659 > 0.05 and t_calculated value -.447 < 2.056. The variable or indicator that most dominantly influences capacity management is capacity implementation (x2) with a value of 5.101. There is a similar influence of all variables on capacity management. With f value of 44.028 > 2.96 in gis. 0.000 < 0.05. R square results of 0.836, can mean that 83.6% of capacity management is influenced by all variables.
Downloads
References
Farida, U. (2017). Pengaruh Upah, Jaminan Sosial Dan Hubungan Antar Karyawan Terhadap Kesejahteraan Karyawan Harian Tetap (Studi Kasus di PT. Kudus Karya Prima Desa Terban, Jekulo, Kudus). Sekolah Tinggi Agama Islam Negeri Kudus : Kudus.
Handayani, D. (2019). Strategi Peningkatan Produktivitas Karyawan Pada PT Perkebunan Nusantara XIV (Pabrik Gula Takalar). Universitas Muhammadiyah Makassar : Makassar.
Mardatillah. (2020). Pengaruh Upah, Pengalaman Kerja Dan Tingkat Pendidikan Terhadap Produktivitas Tenaga Kerja UD Suryadi Coco Pariaman. Institut Agama Islam Negeri (IAIN) Bukittinggi : Bukittinggi.
Maujud, F. (2018). Implementasi Fungsi-Fungsi Manajemen Dalam Lembaga Pendidikan Islam (Studi Kasus Pengelolaan Madrasah Ibtidaiyah Islahul Muta’allim Pagutan). UIN Mataram : Mataram.
Muka, I, W. & Wijaya, I, M. H. (2019). Pengaruh Pengalaman Tenaga Kerja Terhadap Kinerja Kontraktor Pada Proyek Konstruksi Villa. Universitas Hindu Indonesia : Denpasar Timur.
Rofaidah, A. (2018). Perencanaan Proses dan Kapasitas. Sekolah Tinggi Ilmu Ekonomi Mahardhika Surabaya : Surabaya.
Susan, E. (2019). Manajemen Sumber Daya Manusia. Jurnal Manajemen Pendidikan Islam : Adaara.
Mh. Iqbal, D. (2014) . Perencanaan Penyediaan Fasilitas Parkir. Universitas Jember.
Septyanto, K, dkk. (2017). Analisis Kebutuhan Dan Penataan Ruang Parkir Kendaraan (Studi Kasus Pada Lahan Parkir Kampus II Fakultas Teknik Universitas Muhammadiyah Metro). Universitas Muhammadiyah Metro.